Coats 2 of 2 of POR 15 of keel DONE.
Coats 3 of 3 of fairing product on keel DONE.
Coats 6 of 6 of Epoxy on hull DONE
Coats 3 of 3 of VC17 on hull DONE.
Coats 1 of 1 of Cetol on teak DONE.
Coats 1 of 1 of Pre-Kote primer on hull DONE.
Coats 2 of 2 of the blue bootstripe DONE.
Coats 6 of 6 of the hull epoxy under the support pads DONE.
Coats 9 of 9 of the epoxy on the keel DONE.
Coats 3 of 3 of VC-17 on the keel DONE.
Stereo installation DONE.
Wood pannelling installation DONE.
Manufacture, assemble and paint rudder and tiller DONE. (35 hrs)
Coats 4 of 4 of VC-17 on the rudder DONE.
Coats 2 of 4 of the steel grey paint DONE UNTIL FALL.
Coats 2 of 2 of the white upper paint DONE.
Coats 2 of 2 of the blue stripe DONE.
Window 2 of 2 installed DONE.
100 % of Caulking replaced DONE.
Re-wire the VHF and add new antenna DONE.
Survey DONE.
The second coat of grey paint is on - thanks to Rob for helping me out.